NASA Artemis II SLS & Crewed Orion Around the Moon
November 2024
Launch Complex 39B (LC-39B) • Kennedy Space Center (KSC) • National Aeronautics and Space Administration (NASA) • Artemis 2 • Space Launch System (SLS) Block 1 • Four Aerojet Rocketdyne RS-25 Hydrolox (6:1) Engines • Two Northrop Grumman Five Segment Booster (FSB-1) SLS Solid Rocket Boosters (SRBs) • Single Aerojet Rocketdyne RL10C-3 Hydrolox (5.7:1) Upper Stage • ESA Orion European Service Module • Orion • Trans-Lunar Injection (TLI) • Moon
NASA SpaceX Falcon Heavy PPE & HALO to Lunar Gateway
UPDATED • DELAYED
November 2024
Launch Complex 39A (LC-39A) • Kennedy Space Center (KSC) • Falcon Heavy TBC Core • TBC Reusable Side Booster • TBC Autonomous Spaceport Drone Ship (ASDS) • TBC Reusable Side Booster • TBC Autonomous Spaceport Drone Ship (ASDS) • NASA Artemis Lunar Gateway • Maxar Power and Propulsion Element (PPE) • Northrop Grumman Habitation and Logistics Outpost (HALO) • Trans-Lunar Injection (TLI) • Moon
Recent Videos of Artemis Rocket Launches to Space & Events
NSF Live Weekly Artemis Orion Intrepid Museum Astro Live
NASASpaceFlight.com (NSF) • Artemis: After the Launch with Barry Bohnsack, Production Planner for Lockheed Martin's Orion Spacecraft • Orion • Intrepid Museum Astro Live
NASA Artemis I Uncrewed Orion Splashdown
Moon • Lunar Distant Retrograde Orbit (DRO) • Orion • 25 days • Lockheed Martin Orion Skip Maneuver • National Aeronautics and Space Administration (NASA) • Artemis 1 • Realtime Tracking • Press Kit
NASA Artemis I Uncrewed Orion Return Flyby of the Moon
National Aeronautics and Space Administration (NASA) • Artemis 1 • Orion • 25 days • Lunar Distant Retrograde Orbit (DRO) • Moon • Realtime Tracking • Press Kit
NASA Artemis I Uncrewed Orion DRO Exit Burn Around the Moon
National Aeronautics and Space Administration (NASA) • Artemis 1 • Orion • 25 days • Moon • Lunar Distant Retrograde Orbit (DRO) • Realtime Tracking • Press Kit
NASA Artemis I Uncrewed Orion DRO Insertion Burn Around the Moon
National Aeronautics and Space Administration (NASA) • Artemis 1 • Orion • 25 days • Moon • Lunar Distant Retrograde Orbit (DRO) • Realtime Tracking • Press Kit
NASA Artemis I Uncrewed Orion Flyby of the Moon
National Aeronautics and Space Administration (NASA) • Artemis 1 • Orion • 25 days • Trans-Lunar Injection (TLI) • Moon • Lunar Distant Retrograde Orbit (DRO) • Realtime Tracking • Press Kit
NASA Artemis I SLS & Uncrewed Orion Around the Moon
Launch Complex 39B (LC-39B) • Kennedy Space Center (KSC) • National Aeronautics and Space Administration (NASA) • Artemis 1 • Space Launch System (SLS) Block 1 • Four Aerojet Rocketdyne RS-25 Hydrolox (6:1) Engines • Two Northrop Grumman Five Segment Booster (FSB-1) SLS Solid Rocket Boosters (SRBs) • Single Aerojet Rocketdyne RL10C-3 Hydrolox (5.7:1) Upper Stage • ESA Orion European Service Module • Orion • 25 days • Trans-Lunar Injection (TLI) • BioSentinel • SWRI CubeSat to Study Solar Particles (CuSP) • ASU Luna Polar Hydrogen Mapper (LunaH-Map) • Lunar IceCube • Terran Orbital Lunar InfraRed Imaging (LunIR) • JAXA EQUULEUS • JAXA OMOTENASHI • Lunar Distant Retrograde Orbit (DRO) • Moon • Launch Windows • Realtime Tracking • Press Kit • Advisory
NASA Artemis 1 Cryogenic Demonstration Test
Launch Complex 39B (LC-39B) • Kennedy Space Center (KSC) • National Aeronautics and Space Administration (NASA) • Space Launch System (SLS) Block 1 • Four Aerojet Rocketdyne RS-25 Hydrolox (6:1) Engines • Two Northrop Grumman Five Segment Booster (FSB-1) SLS Solid Rocket Boosters (SRBs) • Single Aerojet Rocketdyne RL10C-3 Hydrolox (5.7:1) Upper Stage • Artemis 1
NSF Live Weekly Intrepid Museum
NASASpaceFlight.com (NSF) • NASA Lead Systems Engineer Yves Lamothe • Artemis • Intrepid Museum
Schedule of Upcoming Artemis Rocket Launches to Space, Livestreams & Events
- NET (No Earlier Than)
- TBC (To Be Confirmed)
- TBD (To Be Determined)
Date | Mission | Livestream | Notes |
November 2024 | NASA Artemis II SLS & Crewed Orion Around the Moon | Launch Complex 39B (LC-39B) • Kennedy Space Center (KSC) • National Aeronautics and Space Administration (NASA) • Artemis 2 • Space Launch System (SLS) Block 1 • Four Aerojet Rocketdyne RS-25 Hydrolox (6:1) Engines • Two Northrop Grumman Five Segment Booster (FSB-1) SLS Solid Rocket Boosters (SRBs) • Single Aerojet Rocketdyne RL10C-3 Hydrolox (5.7:1) Upper Stage • ESA Orion European Service Module • Orion • Trans-Lunar Injection (TLI) • Moon | |
November 2024 | NASA SpaceX Falcon Heavy PPE & HALO to Lunar Gateway | Launch Complex 39A (LC-39A) • Kennedy Space Center (KSC) • Falcon Heavy TBC Core • TBC Reusable Side Booster • TBC Autonomous Spaceport Drone Ship (ASDS) • TBC Reusable Side Booster • TBC Autonomous Spaceport Drone Ship (ASDS) • NASA Artemis Lunar Gateway • Maxar Power and Propulsion Element (PPE) • Northrop Grumman Habitation and Logistics Outpost (HALO) • Trans-Lunar Injection (TLI) • Moon |
Last Updated:
Recent Artemis Rocket Launches to Space & Events
Last Updated: